TM 9-2320-366-20-4
(8) Connect connector P119 (17) to connector J119 (12).
c. Follow-On Maintenance.
(1) Install personnel heater (para 18-9).
(3) Install instrument panel assembly (para 7-15).
(4) Start engine (TM 9-2320-366-10-1).
(5) Check VOLTS gage for charge indication (TM 9-2320-
366-10-1).
(6) Shut down engine (TM 9-2320-366-10-1).
End of Task.
Change 1