TM 9-2320-272-24-3
Do not cross hoses during installation. Crossing hoses may result
in injury to personnel.
6.
Install hoses (1), (3), (5), (6), (7), and (8) on control valve (9).
NOTE
Cable clevises are installed the same.
7.
Install two cable clevises (2) on control valve (9) rod with clevis pin (4), washer (15), and new cotter
pin (16). Bend over end of cotter pin (16).
FOLLOW-ON TASKS:
Fill hydraulic oil reservoir (LO 9-2320-272-12).
Start engine (TM 9-2320-272-10) and check hydraulic pump operation.
4-857