4-4. POWER PLANT (M939/A1) REPLACEMENT (Contd)
66.
Connect wire (2) to engine high-temperature sending unit (1).
67.
Connect wire (3) to water temperature sending unit (4).
FOLLOW-ON TASKS:
Install transmission-to-transfer case propeller shaft (para. 3-148).
Install transmission PTO-to-hydraulic pump driveshaft, if equipped (para. 3-334).
Install air intake pipe and hump hoses (para. 3-14).
Install engine oil dipstick and tube (para. 3-3).
Install front exhaust pipe (para. 3-50).
Install radiator fan blade assembly (para. 3-72).
Install radiator (para. 3-59).
Install surge tank (3-61).
Install coolant hoses and tubes (para. 3-54).
Fill steering system to proper oil level (LO 9-2320-272-12).
Fill cooling system to proper coolant level (para. 3-53).
Fill engine to proper oil level (para. 3-5).
Fill transmission to proper oil level (para. 3-133).
Close air reservoir drainvalves (TM 9-2320-272-10).
Connect battery ground cables (para. 3-126).
Adjust modulator cable (para. 3-145).
Adjust throttle control cable (para. 3-45).
Adjust emergency stop control cable (para. 3-44).
Adjust accelerator linkage (para. 3-42).
Never start a new or repaired engine without
Start engine (TM 9-2320-272-10), allow air pressure to build
up to normal operating range, and check for leaks. Road test
vehicle.
4-66