TM 9-2320-272-24-1
3-200. WET AIR RESERVOIR (SUPPLY TANK) AND BRACKET REPLACEMENT (Contd)
b. Installation
CAUTION
Open-end wrench must be used to anchor tank boss fittings when
connecting or disconnecting associated fittings. Damage to tank
bosses may result if open-end wrench is not used.
NOTE
l If new reservoir is being installed, fittings from old reservoir
may be used. Fittings must be cleaned and inspected for cracks
and stripped threads.
Wrap male pipe threads with antiseize tape before installation.
l
1.
Install adapters (18) and (19) on supply tank (17).
2.
Install nipple (20), tee (7), reducer (8), nipple (9), relief valve (11), elbow (10), shutoff valve (6), and
elbow (5) on supply tank (17).
3.
Install elbow (16), nipple (15), shutoff valve (14), and adapter (13) on supply tank (17).
4.
Install elbow (12) on supply tank (17).
5.
Install tee (26), reducer (24), safety valve (23), and elbow (25) on supply tank (17).
6.
Install two support brackets (4) on frame braces (1) with four screws (2) and new locknuts (3).
7.
Install supply tank (17) on two support brackets (4) with two U-bolts (22) and four new locknuts (21).
NOTE
Perform steps 8 through 11 for M934/A1/A2 vehicles.
8.
Install elbow (30) on supply tank (17).
9.
Install elbow (29), shutoff valve (28), and adapter (27) on supply tank (17).
10.
Install support plate (31) on frame (35) with four screws (34).
11.
Install supply tank (17) on support plate (31) with two U-bolts (33) and four new locknuts (32).
3-552