TM 9-2320-272-24-1
18.
Route heat control cable (43) and defroster control cable (32) through diverter brackets (37) and (38).
19.
Install heat control cable (43), defroster control cable (32), and new spring nuts (33) and (41) on
control panel rods (40) and (36).
20.
Install new cotter pins (42) and (47) on control rods (40) and (36).
21.
Install retaining clips (35) and (39), cables (32) and (43), and clamps (34) and (44) on diverter
brackets (37) and (38) with screws (46) and (45).
22.
Install instrument cluster (4) on instrument panel (48) with eight screws (49).
FOLLOW-ON TASKS:
Connect CTIS electrical components (M939A2) (para. 3-470).
Start engine (TM 9-2320-272-10) and check gauges for proper operation. Check
for air leaks at air gauges.