TM 9-2320-260-34-2
16-41. TRANSMISSION POWER TAKEOFF REPAIR (Contd]
Install snapring (27) in groove on rear of reverse gear shaft (26).
32.
Ensure spacer (31) is in position over bearing in PTO housing (32).
33.
34.
Install new gasket (30) and cover (3) over reverse gear shaft (26) and on PTO housing (32) with five
35. Ensure all gears can rotate and both shifter shafts can move to all detent positions.
NOTE
Perform steps 36 through 38 for single output shaft PTO.
36. Ensure spacer (31) is in position over bearing in PTO housing (32).
Install new gasket (36) and cover (35) over reverse gear shaft (26) and on PTO housing (32) with five
37.
Brush additional gear oil on internal parts of PTO.
38.
16-247