TM 9-2320-260-34-2
16-43. TRANSFER POWER TAKEOFF REPLACEMENT (Contd)
b. Installation
NOTE
Perform step 1 for M816 vehicles.
q
Perform steps 2 and 3 for M815 and M819 vehicles.
q
1.
Install coupling (3) on shaft (2).
2.
Aline setscrew holes of shaft (2) and coupling (21) and install coupling (21) on shaft (2) with
setscrew (19).
3.
Thread new safety wire (20) through setscrew (19), wrap ends around coupling (21), twist ends
together, trim excess safety wire (20), and bend remaining safety wire (20) around coupling (21).
4.
Install new gasket (4) and power takeoff (7) on transfer (1) with four new Iockwashers (5), screws (6),
two new lockwashers (9), and nuts (8). Tighten nuts (8) 30-40 lb-ft (41-54 Nm). Tighten screws (6)
40-55 lb-ft (54-75 Nm).
NOTE
Wrap male threads with antiseize tape before installation.
Install elbow (18) on transfer (1).
5.
Install two sleeve seals (15) in tube (16).
6.
7.
Connect tube (16) to elbow (18) and adapter (10).
Install grommet (11) and clamp (14) on tube (16).
8.
9.
Install tube (16) and clamp (14) on bracket (17) with new lockwasher (13) and screw (12). Tighten
screw (12) 40-55 lb-ft (54-75 Nm).
NOTE
Perform step 10 for M815 and M819 vehicles.
10.
Install link rod (23) on power takeoff shift lever (22) with pin (25) and new cotter pin (24).
16-252