TM 9-2320-260-34-2
15-82. LOAD CENTER MAINTENANCE (Contd)
Position air conditioner wiring harness (11) in load center (7).
31.
Install three wires (10) in 20-amp circuit breaker (8) with three setscrews (9).
32.
Install three wires (12), (3), and (6) with new lockwasher (4), screw (5), new lockwasher (2),
33.
and nut (1).
NOTE
Perform steps 34 through 37 for M820 and M820A2 vehicles.
Position blackout bypass wiring harness (13) in load center (7).
34.
35.
Install wire (18) in relay (14) with setscrew (19).
Position wire (20) in relay (14).
36.
Install wire (17) in 20-amp circuit breaker (15) with screw (16).
37.
Position main wiring harness (22) in load center (7).
38.
Install five wires (26) in three 20-amp circuit breaker (24) with three screws (25).
39.
Install wire (28) in neutral bar (23) with setscrew (27).
40.
Install wire (30) in relay (14) with setscrew (28).
41.
42.
Position two wires (21) in relay (14).
43.
Position main wiring harness (33) in load center (7).
44.
Install five wires (36) in three circuit breakers (34) with three screws (35).
Install wire (38) in neutral bar (23) with setscrew (37).
45.
46.
Install three wires (40) in relay (14) with three setscrews (39).
47.
Install cover (32) on load center (7) with six screws (31).
15-310