TM 9-2320-260-34-2
15-82. LOAD CENTER MAINTENANCE (Contd)
1. Install load center (2) on van body (32) with four new lockwashers (31) and screws (30).
2. Install nut (34) on conduit (33).
NOTE
Perform steps 3 through 5 for M820 and M820A2 vehicles.
3. Position 3-phase receptacle wiring harness (35) in load center (2).
4. Install three wires (39) in 20-amp circuit breaker (37) with three screws (38).
5. Install wire (41) on neutral bar (36) with setscrew (40).
15-305