TM 9-2320-260-34-2
15-82. LOAD CENTER MAINTENANCE (Contd)
NOTE
Perform steps 13 through 18 for M820 and M820A2 vehicles.
Position entrance receptacle wiring harness (20) in load center (1).
13.
Install three wires (23) on 100-amp circuit breaker (21) with three setscrews (22).
14.
Install wire (25) in neutral bar (2) with setscrews (24).
15.
Position converter and auxiliary pump wiring harness (26) in load center (1).
16.
17.
Route converter and auxiliary pump wiring harness (26) through conduit (28).
Install six wires (30) in two 20-amp circuit breakers (27) with six screws (29).
18.
15-307