TM 9-2320-260-34-2
15-82. LOAD CENTER MAINTENANCE (Contd)
Solder three wires (2) and four wires (9) to connectors (4) and (8).
19.
NOTE
Apply sealing compound to cover.
Install cover (3) on junction box (1) with eight screws (7).
20.
Connect converter wiring harnesses (5) and (6) to connectors (8) and (4).
21.
Position new gasket (14) on outlet box (15) and solder three wires (16) to connector (11).
22.
Install gasket (14) and cover (13) on outlet box (15) with four screws (12).
23.
Connect auxiliary pump wiring harness (10) to connector (11).
24.
Position heater wiring harness (24) in load center (17).
25.
Install wire (23) in neutral bar (18) with setscrew (22).
26.
Install wire (21) in 20-amp circuit breaker (19) with screw (20).
27.
Position 10kW electric heater wiring harness (30) in load center (17).
28.
Install wire (28) in neutral bar (18) with setscrew (29).
29.
Install three wires (27) in 30-amp circuit breaker (25) with three screws (26).
30.
15-308