TM 9-2320-260-20
I
I
4-53. FLOODLIGHT WIRING HARNESS REPLACEMENT (Contd)
13. Remove ten screws (22), clamps (23), and harness (19) from crane boom (17).
14. Disconnect leads (21) from floodlight (18).
I
I
b. Installation
1. Route harness (19) along crane boom (17), over roller (20), and connect two leads (21) to
floodlight (18).
2. Install harness (19) on crane boom (17) with ten clamps (23) and screws (22).
3. Connect leads (5) to harness leads (6).
4-113