TM 9-2320-392-10-2
M1083A1 SERIES PREVENTIVE MAINTENANCE
0103 00
CHECKS AND SERVICES (PMCS) - Continued
Table 18. Preventive Maintenance Checks and Services (PMCS) - During -
Model M1089A1 - Continued.
ITEM
INTERVAL
MAN-
ITEM
CREWMEMBER
EQUIPMENT
NO.
HOUR
TO BE
PROCEDURE
NOT READY/
CHECKED
AVAILABLE
OR
IF:
SERVICED
2
During
Material
Handling
Crane
(MHC)
Operation -
Continued
CAUTION
Keep hook assembly at least 2 ft (0.61 m) from end of boom. If hook
assembly hits end of boom, Material Handling Crane (MHC) will lose power
for several seconds. Failure to comply may result in damage to equipment.
13. Move TELESCOPE
Boom does not
lever (15) to OUT
extend or hook
position and HOIST
block (18) does
lever (16) to DOWN
not lower.
position (WP 0043 00)
to extend boom (12).
0103 00-203