TM 9-2320-392-10-2
M1083A1 SERIES PREVENTIVE MAINTENANCE
0103 00
CHECKS AND SERVICES (PMCS) - Continued
Table 18. Preventive Maintenance Checks and Services (PMCS) - During -
Model M1089A1 - Continued.
ITEM
INTERVAL
MAN-
ITEM
CREWMEMBER
EQUIPMENT
NO.
HOUR
TO BE
PROCEDURE
NOT READY/
CHECKED
AVAILABLE
OR
IF:
SERVICED
2
During
Material
17. Move BOOM lever
Boom angle
Handling
(18) to UP position
does not
Crane
(WP 0043 00) to
decrease.
(MHC)
decrease boom (12)
Operation -
angle.
Continued
WARNING
Wear heavy leather-palmed work gloves when handling cable.
Cables can become frayed or contain broken wires. Never let
moving cable slide through hands, even when wearing gloves.
Failure to comply may result in injury to personnel.
18. Check portion of
Kinks, frays, or
cable (19) which is
breaks in cable
visible for kinks, frays,
are found.
or breaks.
0103 00-205