TM 9-2320-392-10-1
M1089A1 MATERIAL HANDLING CRANE (MHC)
0043 00
OPERATION - Continued
RAISE AND LOWER LOAD - Continued
CAUTION
Do not allow excessive slack to build up when paying out cable. Failure to
comply may result in damage to equipment.
Use only a straight pull when lifting a load. Failure to comply may result in
damage to equipment.
3.
Operate SWING lever (38) and TELESCOPE lever (32) to center end of boom (39)
directly over load.
4.
Operate HOIST lever (22) to pay out or reel in cable (30) and to connect hook
assembly (26) to load.
5.
Install safety pin (24) in hook assembly latch (25).
0043 00-24