TM 9-2320-392-10-1
M1084A1/M1086A1 MATERIAL HANDLING CRANE
0030 00
(MHC) OPERATION - Continued
RAISE BOOM TO OPERATING POSITION - Continued
6.
Remove pin (32) from turntable bearing (33) to allow turntable (34) to rotate.
7.
Perform the following pre-operational checks on the MHC Overload Shutdown
System (OSS):
a.
Position HOIST lever (22) in UP position until hook assembly (24) is against
boom nose (35).
b.
Continue to hold HOIST lever (22) in UP position until hydraulic system is heard
to by-pass.
0030 00-11