TM 9-2320-392-10-1
M1084A1/M1086A1 MATERIAL HANDLING CRANE
0030 00
(MHC) OPERATION - Continued
SET UP OUTRIGGERS - Continued
NOTE
Both outrigger pads are installed on outriggers the same way. Right side
shown.
2.
Remove pin (18) from outrigger pad (15).
3.
Clean all dirt and debris from outrigger pad (15) and from end of outrigger (19).
4.
Place outrigger pad (15) on bottom of outrigger (19).
5.
Install pin (18) in outrigger pad (15).
WARNING
Keep hands and feet clear of the outriggers during operation.
Failure comply may result in injury to personnel.
6.
Position LH O/R JACK lever (20) to DOWN until outrigger pad (15) is on ground.
7.
Position RH O/R JACK lever (21) to DOWN until outrigger pad (15) is on ground.
0030 00-7