TM 9-2320-392-10-1
M1090A1 DUMP COVER KIT
0028 00
INSTALLATION/REMOVAL - Continued
SOFT TOP (STEEL BOWS) INSTALLATION - Continued
NOTE
Left and right strap supports have six flaps. From front to rear of vehicle,
perform step 27 on first, second, third, and fifth straps on each strap
support.
27. Open four flaps (32) on left strap support (21) and right strap support (22).
28. Position two braces (17) over front tube (23) and under left strap support (21) and
right strap support (22) with approximately 2 feet (0.6 m) between front bow (6) and
each brace (17).
29. Position two braces (17) over rear tube (24) and under left strap support (21) and
right strap support (22) with approximately 2 feet (0.6 m) between rear bow (11)
and each brace (17).
0028 00-11