TM 9-2320-392-10-1
M1090A1 DUMP COVER KIT
0028 00
INSTALLATION/REMOVAL - Continued
SOFT TOP (STEEL BOWS) INSTALLATION - Continued
8.
Remove stowage strap (16) from front bow (6), center bow (9), and rear bow (11).
NOTE
Left and right sides of front, center, and rear bows are released the same
way. Right side shown.
9.
Loosen three tiedown straps (14).
10. Remove three tri-rings (15) on tiedown straps (4) from J-hook (14).
11. Perform steps 9 and 10 on left side.
0028 00-6