TM 9-2320-366-20-5
20-77. M1083/M1093 TANK AND PUMP UNIT TIEDOWN KIT INSTALLATION/REMOVAL
(CONT)
CAUTION
Ensure quick release pins are installed
through both sides of crane pockets. Failure
to comply may result in damage to
equipment.
(37) Install two plugs (75) in crane pockets (78) with quick
release pins (74).
(38) Remove hoses (81 and 82) from holes in skid.
WARNING
Pump unit weighs approximately 870 lbs
(395 kgs). Attach a suitable lifting device
prior to removal. Failure to comply may
result in serious injury or death to
personnel or damage to equipment.
NOTE
Step (39) requires the aid of an assistant.
(39) Remove pump unit (83) from cargo bed (9).
20-488
Change 1