TM 9-2320-366-20-5
(13) Remove cotter pin (30), pin (31), turnbuckle (3), and
front strap (32) from first tiedown ring (33) from front of
cargo bed (9). Discard cotter pin.
(14) Remove cotter pin (34), pin (35), shackle (36), and front
strap (32) from upper tiedown ring (37) on tank (28).
Discard cotter pin.
(15) Perform steps (12) through (14) on right pump strap.
NOTE
Left and right pump straps are removed the
same way. Left pump strap shown.
(16) Remove sleeve (38) from turnbuckle (39).
20-483