TM 9-2320-366-20-5
20-62. LIGHT MATERIAL HANDLING CRANE (LMHC) WEIGHT BLOCK AND WIRE ROPE
REPLACEMENT/REPAIR
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
Engine shut down (TM 9-2320-366-10-1).
LMHC circuit breaker positioned to ON (TM 9-2320-366-
10-1).
LMHC power cable installed (TM 9-2320-366-10-1).
Materials/Parts
LMHC remote control cable installed (TM 9-2320-366-10-
1).
LMHC wire rope assembly fully extended (TM 9-2320-
Personnel Required
366-10-1).
(2)
a. Removal.
NOTE
Perform step (1) if replacing weight block.
(1) Remove two nuts (1), screws (2), lockwashers (3), and
weight blocks (4) from wire rope (5).
Discard
(2) Remove quick release pin (6) from boom (7).
(3) Remove wire rope (5) from sheave (8).