TM 9-2320-366-20-4
(13) Install lockout relay (13) on bracket (14) with screw (15),
washer (16), lockwasher (17) and nut (18).
(14) Install bracket (14) on junction box (2) with two rivets
(19).
(15) Connect new lockout relay connector (20) to lockout
relay (13).
NOTE
Relay socket wires must be cut to length
according to nearest routing in junction box.
(16) Route green wire (21) to ground strip (22).
(17) Cut green wire (21) to length.
(18) Install quick disconnect terminal (23) on green wire (21).
(19) Connect green wire (21) on ground strip (22) position 13.
Change 1
7-717