TM 9-2320-272-24-4
5-82. CEILING TRANSITION MAINTENANCE
THIS TASK COVERS:
c. Assembly
a. Removal
d. Installation
b. Disassembly
INITIAL SETUP:
APPLICABLE MODELS
REFERENCES (TM)
M934/A1/A2
TM 9-2320-272-10
TM 9-2320-272-24P
TOOLS
EQUIPMENT CONDITION
Rivet gun
l Parking brake set (TM 9-2320-272-10).
Van sides fully expanded and secured
l
MATERIALS/PARTS
(TM 9-2320-272-10).
l
l
SPECIAL ENVIRONMENTAL CONDITIONS
Vehicle must be on a level surface.
a. Removal
Remove seven screws (4) from support (8).
1.
NOTE
Assistants will help with step 2.
Remove thirty screws (2) and transition (3) from ceiling (1).
2.
Remove seven rivets (6), retainer (7), seal (5), and support (8) from transition (3). Discard rivets (6)
1.
and seal (5).
Remove ten rivets (18), two retainers (9), and seals (10) from transition (3). Discard seals (10) and
2.
rivets (18).
Remove seven rivets (16), retainer (17), and seal (15) from transition (3). Discard seal (15) and
3.
rivets (16).
Remove four screws (11) and filler angle (12) from transition (3).
4.
Remove three screws (13) and filler angle (14) from transition (3).
5.
5-538