TM 9-2320-272-24-1
NOTE
Male pipe threads must be wrapped with antiseize tape before
installation.
Install air compressor elbow (22) on air compressor (23).
1.
Install engine oil cooler elbow (18) on engine oil cooler (19).
2.
Install return tube (12) on compressor elbow (22) with new bushing (21) and flare nut (20). Do not
3.
tighten flare nut (20).
Connect return tube (12) on engine oil cooler elbow (18) with new bushing (17) and flare nut (16).
4.
Do not tighten flare nut (16).
Install coolant return tube (12) on support bracket (11) with clamp (10), washers (9) and (15), new
5.
lockwasher (14), and nut (13). Tighten nut (13).
Tighten flare nuts (16) and (20).
6.
FOLLOW-ON TASKS: Fill cooling system to proper level (para. 3-53).
Start engine (TM 9-2320-272-10) and check for coolant leaks.
3-143