TM 9-2320-260-34-2
15-44. CEILING FILLER AND SIDE PANELS REPLACEMENT (Cont'd)
d. Left Side Panel and Filler Installation
1.
Install filler (2) on transition (7) with three screws (1).
2.
Install side panel (5) on van ceiling (3), air ducts (4), and transition (7) with seventy-nine screws (6).
FOLLOW-ON TASKS:
Install cord box (TM 9-2320-260-20).
Install telephone jack (left side) (TM 9-2320-260-20).
Install 3-phase receptacles and 400 Hz receptacles (TM 9-2320-260-20).
Install blackout switch (TM 9-2320-260-20).
Retract van body sides (TM 9-2320-260-10).