TM 9-2320-260-34-2
15-36. CEILING AND FRAME MAINTENANCE (Contd)
5. Remove one hundred twenty-eight screws (12), two moldings (11), moldings (13), and seals (10) from
ceiling frame (1). Discard seals (10).
6. Remove six nuts (14), screws (8), lockwashers (7), and two lifting brackets (17). Discard
NOTE
q Perform step 7 if roof is to be removed (subtask b.).
q Assistant will help with step 7.
7. Remove one hundred twenty-four rivets (15), one hundred forty-four rivets (9), and ceiling panel (16)
from ceiling frame (1). Place ceiling panel (16) on wooden blocks. Discard rivets (15) and (9).
15-133