TM 9-2320-260-34-1
8-6. TRANSMISSION MAINTENANCE (Contd)
NOTE
Pack roller bearing race with GAA grease before installation.
Install fourteen roller bearings (12) in input shaft (13).
47.
48.
Install input shaft (13) on transmission (8).
NOTE
Apply sealing compound to gaskets before installation.
Install new gasket (4), new seal (15), and input shaft cover (3) on studs (14) with six new lock-
49.
washers (2) and nuts (1).
NOTE
Steps 50 and 51 apply to transmissions equipped with transmis-
sion power takeoff (PTO).
Install six studs (17) on transmission case (8).
50.
Install new gasket (16) and PTO (20) on transmission (8) with six new lockwashers (18) and
51.
nuts (19).
52.
Install new gasket (9) and cover (10) on transmission (8) with six new screw-assembled lock-
washers (11).
NOTE
Perform step 53 on M816 vehicles. Perform step 54 for all vehicles
except M816.
53.
Install new gasket (5) and shifter housing (6) on transmission (8) with ten new screw-assembled
54.
Install new gasket (5) and shifter housing (6) on transmission (8) with twelve new screw-assembled
8-34