TM 9-2320-392-10-2
M1083A1 SERIES PREVENTIVE MAINTENANCE
0103 00
CHECKS AND SERVICES (PMCS) - Continued
Table 12. Preventive Maintenance Checks and Services (PMCS) - During -
Models M1084A1 and M1086A1 - Continued.
ITEM
INTERVAL
MAN-
ITEM TO BE
CREWMEMBER
EQUIPMENT
NO.
HOUR
CHECKED
PROCEDURE
NOT READY/
OR
AVAILABLE
SERVICED
IF:
1
During
Material
Handling
Crane (MHC)
Operation -
Continued
WARNING
Wear heavy leather-palmed work gloves when handling cable.
Cables can become frayed or contain broken wires. Never let
moving cable slide through hands, even when wearing gloves.
Failure to comply may result in injury to personnel.
17. Check that part
Kinks, frays, or
of cable (8) which is
breaks in cable
visible for kinks,
are found.
frays, or breaks.
18. Check that
Pulley is
pulley (17) at end of
damaged, not
boom (10) is
mounted
mounted securely,
securely, or
turns smoothly, and
does not turn
is not damaged.
smoothly.
0103 00-150