TM 9-2320-392-10-2
M1083A1 SERIES PREVENTIVE MAINTENANCE
0103 00
CHECKS AND SERVICES (PMCS) - Continued
Table 12. Preventive Maintenance Checks and Services (PMCS) - During -
Models M1084A1 and M1086A1 - Continued.
ITEM
INTERVAL
MAN-
ITEM
CREWMEMBER
EQUIPMENT
NO.
HOUR
TO BE
PROCEDURE
NOT READY/
CHECKED
AVAILABLE
OR
IF:
SERVICED
1
During
Material
Handling
Crane (MHC)
Operation -
Continued
CAUTION
Keep hook assembly at least 2 ft (0.6 m) from end of boom. If hook
assembly hits end of boom, Material Handling Crane (MCH) will lose power
for several seconds. Failure to comply will result in damage to equipment.
12. Place
Boom does not
TELESCOPE lever
extend or cable
(14) to OUT position
does not pay
and HOIST lever (7)
out.
to DOWN position
(WP 0030 00) to
extend boom.
0103 00-147