TM 9-2320-392-10-1
EMERGENCY PROCEDURES - Continued
0066 00
MATERIAL HANDLING CRANE (MHC) OPERATION AFTER ELECTRICAL FAILURE
(M1084A1/M1086A1 AND M1089A1) - Continued
9.
Install pin (21) in turntable bearing (22).
10. Place MAST lever (23) in DOWN position and operate manual hydraulic pump (14) to
lower mast (24).
11. Place BOOM lever (25) in DOWN position and operate manual hydraulic pump (14) to
fully lower boom (18).
12. Connect hook assembly (16) to stowage ring (26).
13. Place HOIST lever (15) in UP position and operate manual hydraulic pump (14) to
remove all slack from cable (19).
0066 00-11