TM 9-2320-392-10-1
M1089A1 MATERIAL HANDLING CRANE (MHC)
0043 00
OPERATION - Continued
SET UP OUTRIGGERS - Continued
NOTE
Both outrigger pads are removed the same way. Right outrigger pad shown.
2.
Remove two outrigger pads (16) from tool box.
3.
Remove two pins (17) from outrigger pad (16).
4.
Clean all dirt and debris from socket (18) in outrigger pad (16) and from end of
outrigger (19).
5.
Install outrigger pad (16) on end of outrigger (19) with two pins (17).
0043 00-10