TM 9-2320-392-10-1
M1089A1 MATERIAL HANDLING CRANE (MHC)
0043 00
OPERATION - Continued
PREPARE MHC FOR USE - Continued
1.
2.
Position vehicle on level ground so all loading and unloading can be performed from
one position.
3.
4.
Press N (Neutral) button (9) on WTEC III TPSS (10).
5.
Pull out SYSTEM PARK control (11).
6.
Position PTO switch (12) to on.
0043 00-7