TM 9-2320-366-20-5
17-15. M1089 MATERIAL HANDLING CRANE (MHC) TUBING REPLACEMENT
This task covers:
a. Hydraulic Tubing Locations
b. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Materials/Parts
MHC positioned on boom rest (TM 9-2320-366-10-2).
Dispenser, Pressure Sensitive Adhesive Tape
Engine shut down (TM 9-2320-366-10-1).
Tools and Special Tools
a. Hydraulic Tubing Locations.
WARNING
Wear appropriate eye protection when working under vehicle due to the possibility of falling
debris. Failure to comply may result in injury to personnel.
Prolonged contact with lubricating oil (MIL-L-2104) may cause a skin rash. Skin and clothing that
come in contact with lubricating oil should be thoroughly washed immediately. Saturated clothing
should be removed immediately. Areas in which lubricating oil is used should be well ventilated
to keep fumes to a minimum. Failure to comply may result in injury to personnel.
CAUTION
Cap or plug tubes and connection points to prevent contamination of M1089 MHC hydraulic system.
Failure to comply may result in damage to equipment.
NOTE
Refer to Table 17-4. M1089 Material Handling Crane (MHC) Hydraulic Tubing Locations for locations
of hydraulic tubing on the M1089 MHC. It may not be necessary to remove all hydraulic tubes at one
time.
Tag tubes and connection points prior to removal.
Remove plastic cable ties as required.
Remove clamps and support brackets as required.
Position drain pan to collect oil.