TM 9-2320-366-20-4
(8) Close cover (12) on junction box (13).
(9) Tighten four screws (14) on junction box (13).
NOTE
Install plastic cable ties as required.
(10) Connect connector (15) to hoist down solenoid (16).
c. Follow-On Maintenance.
(1) Connect batteries (para 7-57).
(2) Operate MHC and check hoist down operation (TM 9-
2320-366-10-2).
End of Task.
7-561