TM 9-2320-272-24-4
THIS TASK COVERS:
b. Installation
a. Removal
INITIAL SETUP:
APPLICABLE MODELS
EQUIPMENT CONDITION
l Parking brake set (TM 9-2320-272-10).
M934/A1/A2
Battery ground cables disconnected (para 3-126).
l
TOOLS
Fluorescent light tubes removed (para 3-371).
l
Emergency/blackout lamp and light removed
l
(para 3-372).
REFERENCES (TM)
Blackout light switch and 110-volt receptacle
l
removed (para 3-373).
TM 9-2320-272-10
TM 9-2320-272-24P
NOTE
The left and right main wiring harnesses are replaced the same
l
way. This procedure covers the right main wiring harness.
Tag wires for installation.
l
1.
Remove
six screws (1) and cover (2) from load center (8).
2.
Remove
three setscrews (9) and wires (3) from relay (10).
3.
Remove
setscrew (15) and wire (16) from neutral bus (11).
4.
Remove
three screws (13) and five wires (14) from 20 amp circuit breakers (12).
5.
Remove
screw (4) and clamp (5) from plate (7) and wiring harnesses (6).
6.
Remove
twelve screws (22) and clamps (21) from van ceiling (18) and main wiring harness (20).
7.
Remove
grommet (23) from van side panel (17).
8.
Remove
three screws (25) and wire clip (24) from van side panel (17).
9.
Remove
main wiring harness (20) from van body (19).
Position main wiring harness (20) on van body (19).
1.
Install wire clip (24) on side panel (17) of van body (19) with three screws (25).
2.
Install grommet (23) on side panel (17).
3.
Install twelve clamps (21) on main wiring harness (20) and van ceiling (18) with twelve screws (22).
4.
Install clamp (5) on harnesses (6) and plate (7) with screw (4).
5.
Install five wires (14) on 20 amp circuit breakers (12) with three screws (13).
6.
Install wire (16) on neutral bus (11) with setscrew (15).
7.
Install three wires (3) on relay (10) with three setscrews (9).
8.
Install cover (2) on load center (8) with six screws (1).
9.
5-568