TM 9-2320-272-24-4
Remove sixteen screws (1) and top enclosure (2) from bonnet (8) and air conditioner (7).
5.
Remove twelve screws (4) and right enclosure (3) from bonnet (8) and air conditioner (7).
6.
Remove four screws (14), plate (13), and bellows (12) from left enclosure (11).
7.
Remove ten screws (9) and left enclosure (11) from bonnet (8) and air conditioner (7).
8.
Remove cotter pin (16) and door rod (10) from swing arm (15). Discard cotter pin (16).
9.
Remove seven screws (6) and bottom enclosure (5) from bonnet (8) and air conditioner (7).
10.
Disconnect power cable (24) from air conditioner (7).
11.
Remove screw (26), ground cable (27), and lockwasher (25) from air conditioner (7). Discard
12.
lockwasher (25).
Remove screw (23), ground cable (27), and lockwasher (28) from mounting plate (18) and bonnet
13.
floor (29). Discard lockwasher (28).
Remove five screws (22) from mounting plate (18) and bonnet floor (29).
14.
Remove six screws (21) from mounting plate (17) and bonnet floor (29).
15.
WARNING
All personnel must stand clear during lifting operations.
A snapped cable, or swinging or shifting load may result
in injury or death to personnel.
NOTE
Two assistants will help with step 16.
Attach chains to lifting device and four lifting brackets (20) on air conditioner (7) and remove air
16.
conditioner (7) from bonnet (8). Position air conditioner (7) for access to bottom of unit.
Remove six screws (19) and mounting plates (17) and (18) from air conditioner (7).
17.
Install mounting plates (17) and (18) on air conditioner (7) with six screws (19).
1.
WARNING
All personnel must stand clear during lifting operations.
A snapped cable, or swinging or shifting load may result
in injury or death to personnel.
NOTE
Two assistants will help with step 2.
Attach chains to lifting device and four lifting brackets (20).
2.
Position air conditioner (7) in bonnet (8).
3.
Install mounting plate (17) on bonnet floor (29) with six screws (21).
4.
Install ground cable (27) on mounting plate (18) and bonnet floor (29) with new lockwasher (28),
5.
and screw (23).
Install ground cable (27) on air conditioner (7) with new lockwasher (25), and screw (26).
6.
Install mounting plate (18) on bonnet floor (29) with five screws (22).
7.
Connect power cable (24) to air conditioner (7).
8.
Remove lifting device and chains from air conditioner (7).
9.
5-564