TM 9-2320-272-24-4
5-76. CEILING AND FRAME MAINTENANCE (Contd)
Apply adhesive prior to installation.
l
Insulate areas of dissimilar metal-to-metal contact with zinc
l
chromate primer.
1.
Install woodblock (10), new seal (9), and retainer (8) on van body (11) with fifteen screws (5). Leave
three center holes of retainer open for angle bracket (7) installation.
2.
Install angle bracket (7) on retainer (8) with three screws (6).
3.
Install moldings (3), (4), and (1) on van body (11) with twenty-three screws (2).
NOTE
l Perform steps 4 and 5 only if roof panel was removed.
Insulate entire structure with fibrous glass felt insulation.
l
Assistant will help with steps 4 and 5.
l
4.
Lift roof panel (22) from supports and position on roof frame (20).
5.
Install roof panel (22) on roof frame (20) with one-hundred sixteen new rivets (13), eighteen new
rivets (19), and one-hundred twenty-six new rivets (21).
6.
Install two lifting brackets (23) on roof frame (20) with six new lockwashers (24), screws (12), and
nuts (18).
NOTE
Left and right side moldings are installed the same way. This
procedure covers the right side.
7.
Install new seal (14), molding (15), and molding (17) on roof frame (20) with fifty-nine screws (16).
5-514