TM 9-2320-272-24-1
3-202. PRIMARY AIR RESERVOIR (SUPPLY TANK) REPLACEMENT (Contd)
FOLLOW-ON TASKS: l Install primary low air pressure switch (para. 3-99).
l Install toolbox and step (para. 3-302).
l Start engine (TM 9-2320-272-10) and allow air pressure to build to normal
operating range. Check for air leaks at primary air reservoir. Road test vehicle.
3-565