TM 9-2320-272-24-1
Table 2-1. Unit Preventive Maintenance Checks and Services (Contd).
NOT FULLY
MISSION
PROCEDURE
CAPABLE IF:
Com-
48
Annual
Check for faulty check valves at the primary and secondary
pressed air air tanks and crossed hoses. Crossed hoses occur from A
treadle valve air supply hoses at the primary and secondary
system
air tanks, and B primary and secondary air gauge lines at
the treadle valve.
Chock vehicle wheels. Failure to do so may result
in injury or death to personnel.
Wear safety goggles while performing inspection.
Line is under pressure. Failure to do so may result
in injury to personnel from flying parts or debris.
2-46