TM 9-2320-392-10-2
M1083A1 SERIES PREVENTIVE MAINTENANCE
0103 00
CHECKS AND SERVICES (PMCS) - Continued
Table 17. Preventive Maintenance Checks and Services (PMCS) - Before -
Model M1089A1.
ITEM
INTERVAL
MAN-
ITEM TO BE
CREWMEMBER
EQUIPMENT
NO.
HOUR
CHECKED
PROCEDURE
NOT READY/
OR
AVAILABLE
SERVICED
IF:
1
Before
Shutoff and
Return Valve
CAUTION
Shutoff valve and return valve must be opened before Material Handling
Crane (MHC), underlift assembly, stifflegs, or 30K winches are operated.
Failure to comply may result in damage to equipment.
1. Check that shutoff
(1) and return (2)
valves are open.
Open valves as
required.
2. Check that
Class III leak is
hydraulic hoses (3)
evident.
are not damaged or
leaking.
0103 00-181