TM 9-2320-392-10-2
M1083A1 SERIES PREVENTIVE MAINTENANCE
0103 00
CHECKS AND SERVICES (PMCS) - Continued
Table 12. Preventive Maintenance Checks and Services (PMCS) - During -
Models M1084A1 and M1086A1 - Continued.
ITEM
INTERVAL
MAN-
ITEM
CREWMEMBER
EQUIPMENT
NO.
HOUR
TO BE
PROCEDURE
NOT READY/
CHECKED
AVAILABLE
OR
IF:
SERVICED
2
During
Material
Handling
Crane (MHC)
Remote
Controls -
Continued
CAUTION
Keep hook assembly at least 2 ft (0.6 m) from end of boom. If hook
assembly hits end of boom, Material Handling Crane (MHC) will lose power
for several seconds. Failure to comply may result in damage to equipment.
8. Place TELESCOPE
Boom does not
lever (25) to OUT
extend or cable
position and HOIST
does not pay
lever (26) to DOWN
out.
position to extend
boom.
0103 00-156