TM 9-2320-392-10-2
M1083A1 SERIES PREVENTIVE MAINTENANCE
0103 00
CHECKS AND SERVICES (PMCS) - Continued
Table 12. Preventive Maintenance Checks and Services (PMCS) - During -
Models M1084A1 and M1086A1.
ITEM
INTERVAL
MAN-
ITEM TO BE
CREWMEMBER
EQUIPMENT
NO.
HOUR
CHECKED
PROCEDURE
NOT READY/
OR
AVAILABLE IF:
SERVICED
1
During
Material
Handling
Crane
(MHC)
Operation
WARNING
Keep hands and feet clear of outriggers during operation. Failure to
comply may result in injury to personnel.
NOTE
Position outrigger pads as required so that ends of outriggers lower to
outrigger pad sockets.
1. Prepare
M1084A1/
M1086A1 MHC for
use (WP 0030
00).
2. Set up
outrigger pads (1)
(WP 0030 00).
0103 00-140