TM 9-2320-392-10-1
M1089A1 MATERIAL HANDLING CRANE (MHC)
0043 00
OPERATION - Continued
STOW OUTRIGGERS AND SHUT DOWN MHC
NOTE
Both outrigger pads are removed from outriggers the same way. Right
outrigger pad shown.
1.
Remove two pins (17) from outrigger pad (16).
NOTE
Operate LH O/R JACK and RH O/R JACK lever at the same time.
2.
Move LH O/R JACK lever (20) and RH O/R JACK lever (21) to UP position until
outriggers (19) are fully retracted.
3.
Install two pins (17) in outrigger pad (16).
4.
Stow two outrigger pads (16) in tool box.
0043 00-30