TM 9-2320-392-10-1
LIGHT MATERIAL HANDLING CRANE (LMHC)
0023 00
OPERATION - Continued
PREPARE LIGHT MATERIAL HANDLING CRANE (LMHC) FOR USE - Continued
14. To lower cable (22) place hoist control switch (33) in CABLE OUT position.
15. Disconnect hook (34) from cargo bed tie-down ring (35).
0023 00-16