TM 9-2320-366-20-5
20-74. M1083/M1093 S-280 SHELTER MODELS A, B, OR C TIEDOWN KIT
INSTALLATION/REMOVAL (CONT)
(4) Measure and mark a line (5) 1.19 in. (30 mm) from
LH side of line (4).
(5) Measure and mark a line (6) 2.82 in. (72 mm) from
LH side of line (4).
(6) Measure and mark a line (7) 6.94 in. (176 mm)
from LH side of line (4).
(7) Measure and mark a line (8) 8.56 in. (217 mm)
from LH side of line (4).
(8) Measure and mark a line (9) 2.55 in. (65 mm) down
from line (5).
(9) Measure and mark a line (10) 2.55 in. (65 mm) down
from (6).
(10) Drill six 27/64 in holes (11) in tiedown bracket (2).
(11) Tap six holes (11) check tool kit for tap.
(12) Perform steps (1) through (11) on remaining
tiedowns.
20-428
Change 2