TM 9-2320-366-20-4
(8) Close cover (12) on junction box (13).
(9) Tighten four screws (14) on junction box (13).
NOTE
Install plastic cable ties as required.
(10) Connect connector (15) to boom down lockout solenoid
(16).
c. Follow-On Maintenance.
(1) Connect batteries (para 7-57).
(2) Operate MHC and check boom down lockout operation
(TM 9-2320-366-10-2).
End of Task.
7-537