TM 9-2320-272-24-4
5-47. FORWARD CLUTCH MAINTENANCE (Contd)
25.
Install PTO gear snapring (12) on forward clutch housing (1).
26.
Slide PTO gear (13), chamfered end first, over PTO gear snapring (12) on forward clutch housing (1).
Ensure PTO gear snapring (12) springs outward into internal groove of PTO gear (13).
NOTE
Perform step 27 for transmissions with single-piece bearing
assembly.
27.
Install roller bearing (17) on forward clutch hub (4).
NOTE
Perform steps 28 and 29 for transmission with three-piece
bearing.
Use oil-soluble grease to hold bearing race, bearing, and seal
rings in place.
28.
Install bearing race (14), flat side first, on forward clutch hub (4).
29.
Install bearing (15) and bearing race (16) on forward clutch hub (4).
30.
Install two new seal rings (10) on turbine shaft (11).
31.
Install new seal ring (9) on turbine shaft (11).
Install forward clutch housing (1) and turbine shaft (11) in transmission housing while engaging fourth clutch
drive hub (7) with internal-splined clutch discs of fourth clutch. Ensure the fourth clutch housing (1) is
properly seated.
FOLLOW-ON TASK: Install transmission oil pump and front support (para. 5-46).
5-331