TM 9-2320-272-24-1
3-24. FUEL SELECTOR VALVE MOUNTING BRACKET, AND INDICATOR PLATE
MAINTENANCE (Contd)
NOTE
Locknuts are installed under cab floor.
1.
Align indicator plate (4) and mounting bracket (10) with holes in cab floor (5) and install with two
washers (14), screws (15), and new locknuts (13).
NOTE
Male pipe threads must be wrapped with antiseize tape before
installation.
2.
Install two elbows (8), pipe nipples (6), and elbows (7) on selector valve (9).
3.
Install selector valve (9) on mounting bracket (10) with two new lockwashers (11) and screws (12).
4.
Install lever (3) on selector valve (9) with new lockwasher (2) and screw (1). Ensure lever (3) pointer
is positioned opposite notch on stem of selector valve (9).
FOLLOW-ON TASKS: l Connect selector valve flex hoses (para. 3-23).
Start engine (TM 9-2320-272-10) and check for fuel leaks at valve when switching
l
selector valve to both tanks.
3-77