TM 9-2320-260-20
12-31. HINGED ROOF PANEL MAINTENANCE (Contd)
WARNING
Van body is insulated with fibrous class felt insulation. Gloves,
eyeshields, and dust mask must be worn during hinged roof
replacement. Failure to do so may result in inqury to personnel.
NOTE
Insulate entire structure with fibrous glass felt insulation.
Assistant will help with steps 1 and 2.
1. Install panel (18) on hinged roof frame (1) with forty-one screws (17).
2. Install panel (2) on hinged roof frame (1) with fifty-five screws (10).
3. Install molding (16) on panels (2) and (18) with two screws (15).
4. Install moldings (3), (23), and (24) on panels (2) and (18).
5. Install three fillers (22) on panels (2) and (18) with six screws (21).
6. Install three bars (20) on fillers (22) with six screws (19).
7. Install plate (8) on panel (2) with six screws (9).
8. Install cover (14) on panel (2) with ten screws (13).
9. Install handle (12) on panel (2) with four screws (11).
10. Install three moldings (4), and moldings (6) and (7) on panels (2) and (18) with thirty screws (5).
11. Install three holders (26) on hinged roof frame (1) with six screws (25).
12. Install three clamps (28) on hinged roof frame (1) with twelve screws (27).
1. Attach two chains to lifting device and hinged roof (30).
WARNING
All personnel must stand clear during lifting operations.
A swinging or shifting load may cause injury to personnel.
Ensure lifting capacity is greater than weight (500 lb (227 kg))
of hinged roof. Failure to do so may result in injury to personnel.
NOTE
Assistant will help with step 2.
2. Lift hinged roof (30) from wooden supports and install on van body (29) with sixty-nine screws (34).
3. Install hinged roof (30) on two holding rods (33) and angle brackets (31) with four screws (32).
4. Remove chains from lifting device and hinged roof (30).
12-64